- Home
- i9TV
- Integration by system
- TV master control: design, integration and…
TV master control: design, integration and operation
Master control is the last room before air. i9TV designs, integrates and commissions master control rooms for broadcasters and hands over a tested room, with the crew trained to run it.
i9TV · SystemEverything a station produces passes through one room before it reaches the viewer.
What it is.
Master control, or MCR, receives everything that goes to air: live shows from the studios, recorded content from playout, field links, satellite and network feeds. There the operator switches sources at the right moment, inserts the logo, closed captions and commercial breaks, and delivers a single signal to the transmitter, the pay TV operators and streaming.
When master control fails, the station goes off air. So the design starts with redundancy, sync and monitoring, and only then moves on to panels and screens. At Record Manaus, i9TV delivered master control together with the switcher, studio and a Ross router, with an i9 operations crew inside the station.
What i9TV delivers.
The parts of the system.
The components of a typical system. The design decides which ones go into yours.
How it works.
Projects.
Frequently asked questions.
Does master control need special furniture?
It needs desks and racks built for 24-hour operation, with access for maintenance. i9TV designs custom technical desks together with the system.
What is a TV master control room?
It is the technical room where the station's programming is assembled and sent to air. It takes in studios, playout, links and satellite and outputs a single signal for transmission. The master control glossary entry has the short definition.
What is the difference between master control and a control room?
The control room produces a show: it cuts cameras, mixes audio, adds graphics. Master control receives that show and all the others and decides what goes to air at each moment.
What does a master control operator do?
Follows the schedule, switches sources, inserts breaks, reacts to failures and logs what went to air. The guide what a master control operator does covers the routine.
Can master control be replaced without taking the station off air?
Usually, yes. The new system is built and tested in parallel, and the cutover happens in an agreed window, with the old system ready to come back if needed.
Does master control need to change for TV 3.0?
Brazil's next generation of broadcast TV will require master control to deliver new formats and handle interactivity. Planning for it now avoids buying twice. See TV 3.0 for broadcasters.
Who is my contact during the project?
You deal with one person, from the site survey to air. Phone and WhatsApp: +55 11 3392-7878.
How it connects.
Talk to engineering.
Tell us the date, the place and what you need. The right team replies with one proposal.
+55 11 3392-7878 · contato@i9tv.com.br